Lynca Meats – from power hog to lean operation


By Dawie Kriel, head of Energy Partners Refrigeration
When it comes to refrigeration, the requirements of Meyerton-based pork products supplier Lynca Meats, are as demanding as they get  — and an upgrade was needed to keep up.

Photos by Ilana Koegelenberg

 The sprawling Lynca Meats facility consists of 28 temperature-regulated rooms for the production of a host of processed pork products; an abattoir that markets carcasses, boxed meat and offal; and dedicated units that offer multi-principle cold storage warehousing and logistical solutions to clients.

The temperature requirements for the facility range from -25°C to 5°C, and each room has its own specified cooling shift, which ranges between 2.5 and 24 hours. This means that each room’s coolers need to be controlled separately.

Achieving this with Lynca Meats’ existing more than 20-year-old refrigeration system was fast becoming untenable in terms of cost, as well as reliability.

The old system had extremely high energy requirements, and with the cost of electricity having increased by above-inflation levels over recent years, this was already a significant challenge to keeping operating costs down. The system maintenance had also become quite challenging with maintenance costs rapidly mounting, while the facility experienced frequent periods of downtime that affected production and caused stock losses. An upgrade was therefore a matter of urgency.

Outsourcing refrigeration

Lynca Meats CEO, Brent Fairlie, acknowledged that this necessary upgrade posed the ideal opportunity for an outsourced refrigeration model to be introduced. “Managing the refrigeration requirements of a facility of this scale had become increasingly time-intensive, requiring specialised knowledge. We realised that handing this managerial responsibility over to outsourced specialists would therefore be in the best interest of the business, as it would allow us to focus solely on the company’s core activities.”

EP Refrigeration subsequently offered the upgrade under the EP Cooling Sales Model on a 10-year contract. The entire system would be installed at no capital cost to the client, and EP Refrigeration would maintain the system and sell refrigeration as a utility to Lynca Meats, who would reserve the right to buy the system on residual value at any point in time.

This essentially means that Lynca Meats would receive a guarantee in terms of the cost of refrigeration for a set period, and the responsibility for maintenance and operation would fall on EP Refrigeration for the duration of the contract.

Energy Partners operates on a tariff structure that is similar to most other utilities. This includes an availability charge and a maintenance fee that make up the set monthly cost for the service. Along with that, there is also the variable charge for refrigeration, which is measured in kilowatt-hours refrigeration (kWhR).

To accurately quantify and measure refrigeration, and to bill the client correctly, EP Refrigeration pioneered a cost-effective refrigeration meter to ensure accurate readings. In effect, these meters primarily measure temperature and pressure, from which the used refrigeration units is calculated. This data is also made available to Lynca Meats, to be used for operational or management decisions down the line.

The solution

With the existing system comprising over 50 simplex cooling systems, the complete upgrade of Lynca Meats’ facility started by replacing these units with two medium-temperature multiplex refrigeration plants (plants A and B), as well as an Evapco evaporative condenser with two circuits. For this project it was important to select a unit with a condensing temperature of 35°C and air volume control to regulate the heat rejection rate.

Each multiplex plant is composed of three Bitzer semi-hermetic compressors, each with a 227kWR capacity. The compressors are positioned on one receiver base and their total capacity is controlled via a CR II system with suction pressure transducer control on the lead compressor.

Each of the rooms connected to plants A and B were then outfitted with two HC evaporator coolers, with capacities ranging from 7kWR to 30kWR, depending on their specific requirements. However, there were a handful of exceptions since it was found that the existing coolers in some of the rooms could be integrated into the new system (which saved some costs).

With an evaporation temperature of -7°C, plants A and B supply refrigeration to all the rooms, except for five rooms that demanded a more heavy-duty solution.

For rooms 3, 6, and 8 (which included the blast freezers), a multiplex refrigeration plant (plant C) was installed, which consists of three Bitzer semi-hermetic compressors with a total capacity of 100.5kWR and an evaporation temperature of -32°C. This would provide lower temperatures of up to -25°C for the blast chillers.

In addition, rooms 9 and 10 would be connected via a satellite Bitzer compressor with a capacity of 31.5kWR, positioned on the same receiver base.
Again, HC evaporator coolers were installed in each of the five rooms on plant C’s circuit, with capacities ranging from 8.5kWR to 23kWR. Each of the coolers in all 28 of the facility’s rooms are individually controlled via an eLumac Refrigeration Evaporator Controller, as well as Danfoss electronic expansion valves and supply air, return air, evaporating, and suction temperature sensors.

One interesting advantage with this project was that the client already had a borehole on site that was primarily being used to clean floors and other components. This meant that the evaporative condensers that were specified for the site could be made to run even more cost-effectively, since the borehole negates the need for potable water. The only additional requirement was a water side stream filtration unit, which was provided by Water Upington. This was a crucial addition to remove any dissolved minerals that may have shortened the lifespan of the evaporative condensing unit.

Uninterrupted refrigeration

One of the biggest challenges of this project was ensuring that no further production and stock losses would be incurred. EP needed to complete the installation while the facility remained 100% operational and, as far as possible, they would have to work around existing equipment.

The team decided that the best way forward would be to plan the installation in each individual area around the client’s production schedules and to determine for how long each section of the facility could be cordoned off to decommission old components and install new ones.

For the most part, the EP team could only install new coils over weekends and in the evenings, and connect them to their respective refrigeration plants one at a time. While this was taking place, they would also decommission the old system step-by-step as each room was upgraded. In the end, the success of this hinged on very close interaction and coordination with the client.

Having started in January of 2019, work on the plant officially concluded in the first week of April, without any operational disruptions having been experienced by Lynca Meats over the working period. The newly installed system is performing as predicted and has achieved a 30% reduction in the cost of refrigeration for the client. In addition to this, with the client no longer having to be responsible for managing and maintaining the system under the outsourced contract, Lynca Meats is also saving countless working hours.

The success of this project not only showcases what can be achieved with a state-of-the-art refrigeration system, but also serves as a case study for the benefits of outsourced refrigeration.

Click here to read the issue of Cold Link Africa

 


CLA reader reg201902

Product of

IMD logo White

 

Interact Media Defined (IMD), is one of South Africa’s leading multi-media magazine publishers READ MORE

PRIVACY & COOKIE POLICIES

Cookie policy
Privacy & Cookie policy
Privacy policy

Talk to us

JHB T : +27 (0) 11 579 4940
CPT T : 0861 727 663
E : admin@interactmedia.co.za

13A Riley Road, Bedfordview,
South Africa 2007

© Interact Media Defined